UPES-ECS Go-Live Checklist

Final gate before UPES-ECS is declared production-ready. Nothing here is optional.


1. Minimum feature set live

  • [ ] SIP registration (mobile over Wi-Fi + fixed devices)
  • [ ] SAP-ID → SAP-ID internal calling
  • [ ] 111 → ERT queue → offline coach (102) fallback with background Lead/backup alert → voicemail catch
  • [ ] ERT answering (min 2, recommended 3+ available)
  • [ ] Emergency recording + incident logging
  • [ ] Basic logs (CDR/CEL/queue)
  • [ ] Fixed ERT / Security 4300 / Medical 4200 devices (if teams in pilot)
  • [ ] Health check (script/CLI at minimum)
  • [ ] Backup + tested restore
  • [ ] 199 drill mode safe

2. Fully tested (from Pilot Test Plan)

  • [ ] 111 · 199 · queue · press-1 first-aid · offline coach (102) fallback · voicemail · recording
  • [ ] Access restrictions (paging/conference/recording denied to students)
  • [ ] Fixed devices register with correct caller ID
  • [ ] Backup/restore config test passed
  • [ ] All 19 functional tests passed

3. Infrastructure confirmed (collect from UPES IT)

  • [ ] Static server IP / subnet / gateway set
  • [ ] pbx.upes.lan / sip.upes.lan resolve (or IP fallback documented)
  • [ ] Campus Wi-Fi SSID confirmed
  • [ ] Client isolation checked (SIP/RTP to PBX allowed)
  • [ ] Allowed subnets set; guest Wi-Fi blocked; management subnet separated
  • [ ] Router/switch/AP models recorded; capacity acceptable

4. People & process ready

  • [ ] Final ERT roster set; queue membership configured
  • [ ] ERT trained on the ERT SOP; completed a drill
  • [ ] Control-room/daily-readiness owner assigned
  • [ ] Support/helpdesk runbook in place
  • [ ] Student + ERT setup guides distributed
  • [ ] "Campus Emergency: Dial 111 on UPES-ECS" posters ready

5. Policy & approvals

  • [ ] Recording-retention policy approved by UPES administration
  • [ ] Access-control matrix approved
  • [ ] Paging-approval authority (ERT Lead / Incident Commander) confirmed
  • [ ] Backup encryption + access policy in place
  • [ ] Go-live approved by UPES administration + ERT Lead + IT owner

6. Phase-1 success criteria — all must pass

Mobile SIP registration over Wi-Fi · SAP-ID → SAP-ID calling · any user calls 111 · 111 reaches queue · press-1 first-aid works · offline coach (102) fallback with background Lead/backup alert works · voicemail catch works · recording works · student calls not recorded · paging restricted · conference restricted · dispatch/bridge works · health checks pass · backup/restore passes · drill mode safe · SOP understood.


7. Rollback triggers (abort go-live / revert)

  • 111 fails to route
  • Queue unavailable / zero available ERT
  • Recording fails
  • PBX unstable
  • Wi-Fi can't carry calls
  • Unauthorized-access risk detected

If any trigger fires: do not go live (or roll back to the last good snapshot), fix, re-test, re-approve.


8. Day-1 operations

  • [ ] Daily ECS Readiness Check scheduled + owner assigned
  • [ ] Weekly drill health report scheduled
  • [ ] Monthly directory/device review scheduled
  • [ ] Quarterly (monthly in early pilot) restore test scheduled
  • [ ] Incident/missed-call review discipline active (5-min review during active hours)

Sign-off

Role Name Date
IT / UPES-ECS Admin
ERT Lead / Incident Commander
UPES Administration

Go-live date: ______ (set only after all boxes checked).