UPES-ECS Test Evidence & Sign-off Sheet

Purpose: a fill-in record proving each pilot test actually passed — the evidence companion to the Pilot Test Plan. Print it, run the tests, fill every Result cell, attach evidence, then use it for go-live sign-off (Go-Live Checklist).

Every functional row is a Must pass. A failed 111 / 199 test or a recording failure is a critical, do-not-go-live condition (see §6).


Header — fill before testing

Field Value
Date
Environment ☐ Campus fixed ☐ Van
Tester(s)
Asterisk version
FreePBX version
Config version
Server upes-ecs-pbx-01 /

1. Functional tests (all 19 must pass)

From Pilot Test Plan §2. Record evidence for each: recording filename, incident ID, or log line.

# Test Expected result Result (PASS/FAIL) Evidence / notes Tester Date
1 Mobile SIP registration over Wi-Fi Registers + stays registered
2 SAP-ID → SAP-ID calling Connects, clear two-way audio
3 Any authenticated user calls 111 Reaches ERT queue
4 111 reaches ERT queue ERT device rings
5 ERT answers Caller ID shows EMERGENCY 111 - Name - SAP ID
6 Escalation Unanswered → Lead 4101 → backup group
7 Emergency voicemail Records; creates Missed Emergency Incident (Critical, Pending)
8 Recording for 111 File created, correct naming, linked to incident
9 Student calls not recorded No recording produced
10 Warm transfer Caller handed off after target confirms
11 Three-way bridge Caller + ERT + responder all connected
12 Paging restricted Authorized works; student blocked + logged
13 Conference 9000 restricted Authorized joins; unauthorized blocked + logged
14 Pause/resume *45/*46 Paused agent skipped by queue
15 Missed-call review Appears in review queue; callback works
16 199 drill Simulates 111, no real dispatch, DRILL-ONLY
17 Health check Script/CLI reports status correctly
18 Backup/restore Config restore test passes
19 SOP understood ERT completes a call-handling drill

2. Capacity / quality checks

From Pilot Test Plan §3.

Test Target Result (PASS/FAIL) Evidence / measured value Tester Date
Simultaneous SIP registrations Pilot count stable
Simultaneous student calls 10 without degradation
Simultaneous emergency calls 2–5 answered
Normal load vs 111 priority 111 unaffected by normal traffic
AP behaviour under voice load No excessive drops
Latency / jitter / loss < 150 ms · low · < 1%
Call setup time < 3 s internal
PBX CPU/RAM Within headroom
Recording storage growth Tracked; disk < 75%

3. Security / access checks

From Pilot Test Plan §5.

Check Expected Result (PASS/FAIL) Evidence / log line Tester Date
Anonymous SIP rejected Rejected
Guest Wi-Fi blocked from registering Blocked
Unknown device registration Blocked / monitored
Student denied paging/conference/recordings Denied + logged (Access Denied Event)
Failed registrations logged Logged
Lost-device reset flow Works

4. Edge cases

From Pilot Test Plan §6.

Case Expected Result (PASS/FAIL) Evidence / incident ID Tester Date
Caller hangs up before voicemail Missed emergency record created (no voicemail)
Caller says nothing to voicemail Silent voicemail saved, Pending Review
Repeated calls from same SAP ID Grouped by SAP ID + time window
Queue has zero available responders Accepts call, immediately escalates, raises alert
Weak Wi-Fi mid-call Move caller / use fixed phone / ERT callback
AP overloaded Escalate to IT; reduce load; add AP/voice VLAN later

5. Mobile-specific checks (optional per-device record)

From Pilot Test Plan §4 · SOP 24.

Check Result (PASS/FAIL) Phone model / notes Tester Date
Registers + reconnects after Wi-Fi drop
111 + another SAP-ID call, two-way audio
Behaviour on screen lock documented
Mic permission behaviour verified
Caller ID renders Name - SAP ID

6. Critical-failure reminder

Do-not-go-live conditions. If any of these fail, stop — do not sign off until fixed and re-tested: - A failed 111 test (tests 3, 4, 5). - A failed 199 drill (test 16). - A recording failure on 111/199 (test 8). - Missed-emergency capture not working (test 7).

Re-run the whole affected row on 199 before 111 after any fix, and back up before re-config.


7. Final sign-off

Testing complete, all 19 functional tests PASS, capacity/security/edge checks recorded, and ERT drill completed. Sign-off order: IT Admin + ERT Lead, then University. See Pilot Test Plan §7 and Go-Live Checklist.

Role Name Date Signature
IT / UPES-ECS Admin
ERT Lead / Incident Commander
University (UPES administration)

Go-live approved: ☐ Y ☐ N

Reason / conditions (if N): ____________